Princess Tower by Tameer Holdings

Tameer Holdings

Princess Tower

Dubai

The Project

A closer look at Princess Tower

Collaboration between ACC and Grocon saw the implementation of the Lubeca hydraulic jump-formwork system for both the lift core and the perimeter column and beam system - the ‘tube in tube’ structure. Both the core and the perimeter structures had a significant transfer structure at level 6 and belt structures at plant floors 24, 52 and 78; requiring the formwork systems to expand and contract in thickness at each of these, and then further contract as wall thicknesses reduced through the tower height. Following immediately after Eureka in Australia, Princess adopted the same vertical transportation systems - utilising internal man materials hoist and jump-lifts. A key innovation was the erection of the façade from the trailing perimeter protection screen, attached to the column and beam jump-form. The facade installation kept pace with the structure throughout its entire height.

Gallery

Renders and lifestyle

Official imagery supplied by the developer. Select any image to view it full size.

Documents

The full detail

Share your details once and the document you request unlocks immediately — no waiting for an email.

Locked

Brochure

PDF · 798 KB

Interested in Princess Tower?

Speak to a UAE property advisor about availability, current pricing and the fastest route to ownership.