
Tameer Holdings
Princess Tower
Dubai
Ein genauerer Blick auf Princess Tower
Collaboration between ACC and Grocon saw the implementation of the Lubeca hydraulic jump-formwork system for both the lift core and the perimeter column and beam system - the ‘tube in tube’ structure. Both the core and the perimeter structures had a significant transfer structure at level 6 and belt structures at plant floors 24, 52 and 78; requiring the formwork systems to expand and contract in thickness at each of these, and then further contract as wall thicknesses reduced through the tower height. Following immediately after Eureka in Australia, Princess adopted the same vertical transportation systems - utilising internal man materials hoist and jump-lifts. A key innovation was the erection of the façade from the trailing perimeter protection screen, attached to the column and beam jump-form. The facade installation kept pace with the structure throughout its entire height.
Rendern und Lebensstil
Offizielle Bilder vom Entwickler zur Verfügung gestellt. Wählen Sie ein beliebiges Bild aus, um es in voller Größe anzuzeigen.
Der volle Einzelheiten
Teilen Sie Ihre Daten einmal und das Dokument, das Sie anfordern, wird sofort freigeschaltet - kein Warten auf eine E-Mail.
Broschüre
PDF · 798 KB
Interesse an Princess Tower?
Sprechen Sie mit einem Immobilienberater der VAE über Verfügbarkeit, aktuelle Preise und den schnellsten Weg zum Eigentum.
