Princess Tower door Tameer Holdings

Tameer Holdings

Princess Tower

Dubai

Het project

Een blik van dichterbij Princess Tower

Collaboration between ACC and Grocon saw the implementation of the Lubeca hydraulic jump-formwork system for both the lift core and the perimeter column and beam system - the ‘tube in tube’ structure. Both the core and the perimeter structures had a significant transfer structure at level 6 and belt structures at plant floors 24, 52 and 78; requiring the formwork systems to expand and contract in thickness at each of these, and then further contract as wall thicknesses reduced through the tower height. Following immediately after Eureka in Australia, Princess adopted the same vertical transportation systems - utilising internal man materials hoist and jump-lifts. A key innovation was the erection of the façade from the trailing perimeter protection screen, attached to the column and beam jump-form. The facade installation kept pace with the structure throughout its entire height.

Galerij

Renders en levensstijl

Officiële afbeeldingen geleverd door de ontwikkelaar. Selecteer een afbeelding om het volledige formaat te bekijken.

Documenten

De volledige details

Deel je gegevens één keer en het document dat je aanvraagt, is meteen beschikbaar — je hoeft niet op een e-mail te wachten.

Vergrendeld

Brochure

PDF · 798 KB

Interesse in Princess Tower?

Praat met een vastgoedadviseur van de VAE over beschikbaarheid, actuele prijzen en de snelste route naar eigendom.